Changes to Step #2
Edit by Hybrid Racing —
Edit approved by Hybrid Racing
- Before
- After
- Unchanged
Step Lines
+ | [title] Removal - Reservoir |
---|---|
+ | [* 1] Remove the x1 M6x1.0 bolt mounting reservoir to strut tower. Use a 10mm socket and extension. |
+ | [* 10] The reservoir hose does not need to be removed from CMC yet. As you will see in later steps, the CMC and Reservoir and be pulled out together. |
Image 1
No previous image
Added
Image 2
No previous image
Added