Changes to Step #19
Edit by Hybrid Racing —
Edit approved by Hybrid Racing
- Before
- After
- Unchanged
Step Lines
[* 1] Install the clutch line on the new CMC and make sure it is clocked correctly. The fitting should be in line with the mounting face. | |
- | [* 1] This is done to ensure no contact between the firewall and clutchline. |
- | [* 1] Be sure to install the new firewall seal. |
+ | [* 9] This is done to ensure no contact between the firewall and clutchline. |
+ | [* 10] The banjo fitting should have a washer on the top and bottom. |
+ | [* 11] Be sure to install the new firewall seal. |