Skip to main content

Changes to Step #1

Edit by Hybrid Racing

Edit approved by Hybrid Racing

Before
After
Unchanged

Step Lines

[title] Installation
[* 9] Ensure the o-ring is installed evenly and is not damaged.
-[* 1] Use the OEM bolts and tighten them to 9 ft-lb.
+[* 1] Drain engine coolant enough so the remaining level is lower than the upper radiator hose.
+[* 1] Disconnect the upper rad hose from the engine thermostat housing.
+[* 1] Remove the three 10mm M6 bolts that hold the housing in place.
+[* 5] Install the Hybrid Racing thermostat and torque bolts to 9ftlb.