Changes to Step #1
Edit by Hybrid Racing —
Edit approved by Hybrid Racing
- Before
- After
- Unchanged
Step Lines
+ | [title] Installation |
---|---|
+ | [* 9] Ensure the o-ring is installed evenly and is not damaged. |
+ | [* 1] Drain engine coolant enough so the remaining level is lower than the upper radiator hose. |
+ | [* 1] Disconnect the upper rad hose from the engine thermostat housing. |
+ | [* 1] Remove the three 10mm M6 bolts that hold the housing in place. |
+ | [* 5] Install the Hybrid Racing thermostat and torque bolts to 9ftlb. |
Image 1
No previous image
Added