Changes to Step #2
Edit by Hybrid Racing —
Edit approved by Hybrid Racing
- Before
- After
- Unchanged
Step Lines
- | [* 1] Insert wisdom here. |
---|---|
+ | [title] Spacer installation |
+ | [* 1] Once you have determined which pin to use, push it through the beating. Make sure you install it with the retaining ring on TOP. |
+ | [* 1] The spacer is also part of the bushing and the shifter cable will require the spacer to be on the bottom. The laser-etched face is the top. |
+ | [* 1] Once the spacer is locked into the bearing, you can now proceed with the installation. |